|
|
SiteMap
|
You are here: home->sp_inst->B11->Z.0.1.8.0.A.1
0180
How long before the proposed operation should a request be submitted to the controlling ATC facility to operate in Class C airspace without the required altitude reporting transponder?
| | A) 1 hour. |
| | B) 8 hours. |
| | C) 24 hours. |
|
|
|
|