|
|
SiteMap
|
You are here: home->inst_rat->B10->1.4.0.4.8.A.1
4048
Which checks and inspections of flight instruments or instrument systems must be accomplished before an aircraft can be flown under IFR?
| | A) ELT test within 30 days, altimeter systems within 12 calendar months, and transponder within 24 calendar months. |
| | B) VOR within 24 calendar months, transponder within 24 calendar months, and altimeter system within 12 calendar months. |
| * | C) VOR within 30 days, altimeter systems within 24 calendar months, and transponder within 24 calendar months. |
|
|
|
|