Exams4Pilots Logo
 
Quick Links
Take a Practice Exam
Contribute to the Site
Browse the Exams
About this Site
Privacy Policy
Terms & Conditions
Site Map
New User
Log In
Examine My Cookies
Contact WebMaster
 
Exams4Pilots Forum
Forum Home
- Latest News
- Testimonials
- Tips & Tricks
- Stuck Mike
- Bug Reports
- Feature Request
 

 
SiteMap
You are here: home->inst_rat->B10->1.4.0.4.8.A.1

4048
Which checks and inspections of flight instruments or instrument systems must be accomplished before an aircraft can be flown under IFR?
A) ELT test within 30 days, altimeter systems within 12 calendar months, and transponder within 24 calendar months.
B) VOR within 24 calendar months, transponder within 24 calendar months, and altimeter system within 12 calendar months.
*C) VOR within 30 days, altimeter systems within 24 calendar months, and transponder within 24 calendar months.

 

This site was made possible by:
Linux Logo Apache Logo Perl Logo
 
Validate me