|
|
SiteMap
|
You are here: home->inst_rat->B08->4.4.4.6.3.A.1
4463
Which procedure should you follow if you experience two way communications failure while holding at a holding fix with an EFC time? (The holding fix is not the same as the approach fix.)
| * | A) Depart the holding fix at the EFC time. |
| | B) Proceed immediately to the approach fix and hold until EFC. |
| | C) Depart the holding fix to arrive at the approach fix as close as possible to the EFC time. |
|
|
|
|