|
|
SiteMap
|
You are here: home->flt_inst->B11->3.6.4.7.7.A.1
6477
How long before the proposed operation should a request be submitted to the controlling ATC facility to operate in Class C airspace without the required altitude reporting transponder?
| | A) 8 hours. |
| | B) 24 hours. |
| * | C) 1 hour. |
|
|
|
|