Exams4Pilots Logo
 
Quick Links
Take a Practice Exam
Contribute to the Site
Browse the Exams
About this Site
Privacy Policy
Terms & Conditions
Site Map
New User
Log In
Examine My Cookies
Contact WebMaster
 
Exams4Pilots Forum
Forum Home
- Latest News
- Testimonials
- Tips & Tricks
- Stuck Mike
- Bug Reports
- Feature Request
 

 
SiteMap
You are here: home->atp->B15->1.9.3.5.9.A.1

9359
Which operational requirement must be observed when ferrying an air carrier airplane when one of its three turbine engines is inoperative?
A) The weather conditions at takeoff and destination must be VFR.
B) Weather conditions must exceed the basic VFR minimums for the entire route, including takeoff and landing.
C) The flight cannot be conducted between official sunset and official sunrise.

 

This site was made possible by:
Linux Logo Apache Logo Perl Logo
 
Validate me