|
|
SiteMap
|
You are here: home->atp->B15->1.9.3.5.8.A.1
9358
A commercial operator plans to ferry a large, four-engine, reciprocating-engine-powered airplane from one facility to another to repair an inoperative engine. Which is an operational requirement for the three-engine flight?
| | A) The computed takeoff distance to reach V1 must not exceed 70 percent of the effective runway length. |
| | B) The gross weight at takeoff may not exceed 75 percent of the maximum certificated gross weight. |
| | C) Weather conditions at the takeoff and destination airports must be VFR. |
|
|
|
|