|
|
SiteMap
|
You are here: home->atp->B10->1.9.3.7.7.A.1
9377
Which checks and inspections of flight instruments or instrument systems must be accomplished before an aircraft can be flown under IFR?
| | A) ELT test within 30 days, altimeter systems within 12 calendar months, and transponder within 24 calendar months. |
| * | B) VOR within 30 days and altimeter systems and transponder within 24 calendar months. |
| | C) Airspeed indicator within 24 calendar months, altimeter system within 24 calendar months, and transponder within 12 calendar months. |
|
|
|
|