Exams4Pilots Logo
 
Quick Links
Take a Practice Exam
Contribute to the Site
Browse the Exams
About this Site
Privacy Policy
Terms & Conditions
Site Map
New User
Log In
Examine My Cookies
Contact WebMaster
 
Exams4Pilots Forum
Forum Home
- Latest News
- Testimonials
- Tips & Tricks
- Stuck Mike
- Bug Reports
- Feature Request
 

 
SiteMap
You are here: home->amg->I02->I.8.4.6.3.A.1

8463
After a mechanic holding an airframe and powerplant rating completes a 100-hour inspection, what action is required before the aircraft is returned to service?
A) A mechanic with an inspection authorization must approve the inspection.
B) Make the proper entries in the aircraft's maintenance record.
C) An operational check of all systems.

 

This site was made possible by:
Linux Logo Apache Logo Perl Logo
 
Validate me