|
|
SiteMap
|
You are here: home->amg->I02->I.8.4.6.3.A.1
8463
After a mechanic holding an airframe and powerplant rating completes a 100-hour inspection, what action is required before the aircraft is returned to service?
| | A) A mechanic with an inspection authorization must approve the inspection. |
| | B) Make the proper entries in the aircraft's maintenance record. |
| | C) An operational check of all systems. |
|
|
|
|