|
|
SiteMap
|
You are here: home->ama->F04->F.8.2.5.7.B.1
8257
The vast majority of aircraft control cables are terminated with swaged terminals, that must be
| | A) checked with a go-no-go gauge before and after, to show compliance with the manufacturers requirements after the swaging operation. |
| | B) corrosion treated to show compliance with the manufacturers requirements after the swaging operation. |
| | C) pull tested to show compliance with the manufactures requirements after the swaging operation. |
|
|
|
|