|
|
SiteMap
|
You are here: home->ama->D04->D.8.0.9.3.A.1
8093
Which is considered good practice concerning the installation of acrylic plastics?
| | A) When rivets are used, adequate spacer or other satisfactory means to prevent excessive tightening of the frame to the plastic should be provided. |
| | B) When nuts and bolts are used, the plastic should be installed hot and tightened to a firm fit before the plastic cools. |
| | C) When rivets or nuts and bolts are used, slotted holes are not recommended. |
|
|
|
|